
Consistent specification from the first room to the last
Hotel furnishing to approved specifications, with clear supply phases aligned with the project programme. We work from the bill of quantities and the designer or operator specification, and build one complete model room for you to approve before volume production begins. Every room is then made to the same template and materials, each batch is checked against the approved model room on a size-and-finish checklist before it leaves the factory, then arrives in phases, and is installed and handed over floor by floor by our team. And because the factory is ours, the schedule is in our hands, not those of another supplier.
Upload your BOQ or specificationFrom guest room to lobby
Guest rooms & suites
Beds, headboards, wardrobes, desks and TV units to one fixed specification for every room.
Lobbies, restaurants & halls
Lobby, restaurant and meeting-room furniture to the interior designer's design.
Workstations & meeting rooms
Workstations, executive desks and meeting tables for offices and headquarters.
Materials for heavy use
Fabrics, surfaces and finishes that withstand heavy daily use and are easy to maintain.
Mock-up or samples before volume
A full mock-up room or samples for you to approve before volume production.
Phased delivery & installation
Phased delivery to the programme, with installation and handover floor by floor.
From the BOQ to the last floor handed over
- 01Bill of quantitiesWe study the BOQ and the designer's or operator's specification.
- 02Mock-up roomWe build a complete mock-up room for approval before production.
- 03Volume productionEvery room to the same approved template and materials.
- 04Batch inspectionDimensions and finish checked against a list before leaving the factory.
- 05Delivery and installationBatches to the project programme, handed over floor by floor.
Questions about hotel & office furnishing



